Technological procedure for mounting


1.Surface preparation

2.Installation


Surface preparation

• The system components are to be installed only on dry and thoroughly cleaned surfaces free from pigeon droppings, grease, and dust at a temperature of 5°C or more.


Installation


The strips are to be placed parallel to the edge of the surface in a row, side by side. For the drainage of water from the area behind the strips, a 5mm gap should be left between the individual strips.

  • Mounting using a silicone glue
  • - For mounting using glue, we recommend Silirub 2® neutral transparent silicone glue by Soudal®.
  • - The glue must be applied on the full length of the basic strip.
  • - The strip with the silicone applied is to be lightly pressed onto the surface. Then we can check whether the strip is mounted in the required position.
  • - The glue sets in 24 hours. After 10 minutes the glue produces a hard shell.
  • - One cartridge of the glue can be used to mount 8m to 12m of the spike system, depending on the surface material.

↑ Up

  • Mounting using nails
  • - Nails are to be used for mounting onto wooden surfaces.
  • - For the nails, the holes in the basic strips are to be used.

↑ Up

  • Mounting using wood screws
  • - Screws are to be used for mounting onto wooden surfaces.
  • - For the screws, the holes in the basic strips are to be used.

↑ Up